Since its incorporation in 2004 the
company has been engaged in separate interrelated activities such as the
following:-
o Real estate development
o Laterite Stone Crushing Plant - Faraba
o Supply of building materials
o Borehole drilling
o Manufacturing of Compressed Interlocking
Paving Blocks
Real Estate
Development
Paradise
Estate
As part of its
business operations in The Gambia, Swami India is currently engaged in the
development of the Paradise Estate in Old Yundum on the coastal highway. The
main objective of the project is to provide good quality housing to The Gambia
populace at affordable prices. The Paradise Estate Project comprises a total of
160 houses to be undertaken in two phases. Fifty nine houses are being
built in the first phase in three model designs namely Katchikally, Georgetown
and Toronto. The second phase consists of 101 units all containing the same
model designs as the first phase units.
Paradise City
(Farato)
The Farato project is the
second estate development project undertaken by Swami in 2008. Farato city
which consist of 170 plots was developed as a site and service scheme. It was
projected for completion in four years but due to high demand all the plots
have been sold before the end of the project life. The project also includes
some low cost houses comprising of 2 bedrooms each on a plot size of 10 m x 20
m
Sun
Beach Village Housing Project
The Sun beach village
project is a site and service scheme comprising the development of a 43
hectares piece of land in Sanyang village. A site and service scheme is an
improved version of the conventional or public land allocation system. The land
is to be developed by simply putting in the necessary infrastructure which
would include the construction of a wide road network made of laterite stones
and hard paved with blocks, a developed play ground, a fully developed school
with buildings, a well equipped medical centre, a green park, fully developed
supermarket, a water reticulation network, a 3 phase over head electricity distribution
system and a sound drainage system.
The land will be
demarcated into 520 plots ranging in size from 450m2 to 1000m2 .
The project has the distinctive advantage of providing the beneficiaries with
the opportunity to opt for a turnkey arrangement with Swami or a
contractor-built house or a less expensive own-built house which allows for
much participation and decision making by the beneficiary. There is a greater
access to housing in a site and service scheme than in a completed housing
option.
Project Site and Location
Sanyang is located in
Kombo north along the coastal strip. Agriculture is the main land use. Sanyang
is a typical rural village that is gradually changing in character as an urban
settlement because of increase commercial activity, tourism and fishing.
The site where the
project is located is four kilometres away from the coastal high way. The land
has sandy or loamy surface and flat in nature slightly sloping towards the
beach and the vegetation is all grass land.
The project is
located within the area designated for agricultural use but the developer has
planning approval for change of land use to residential. The site falls within
the jurisdiction of the State lands Act that is under the control of central
government. The Act recognises the existence of two different kinds of land
teneurship within its jurisdiction i.e. traditional or customary ownership and
the allocation system characterized by a proper legal registration system.
Swami has legal title to the property with a duly registered lease of the land
in question.
Laterite stone Crushing Plant
This stone crushing
activity is being undertaken by Swami purposely as a complementary venture
meant to satisfy the needs of the company in its construction projects.
As the company embarked on large scale construction projects there was the need
to ensure a steady and uninterrupted supply of stones hence the establishment
of the crushing plant. The plant has a monthly production capacity of 2500
cubic metres of stones. Three types of stones are crushed at the plant as
mentioned below and are all of high quality. They are 16 x 25, 8 x 16 and 0 x 3
Borehole
Drilling
The bore hole
drilling activity was started in 2007. The company has drilling machines that
meet the required standard sizes of 8”, 6” and 4.5” and can drill up to a
maximum dept of 80 metres. Since inception the company has drilled 300 bore
holes.
Paving
blocks & tile Manufacturing
The company is
engaged in the manufacturing of paving blocks and tiles by using gravel dust
from its literate stone crushing plant at the quarry in Farato. It manufactures
heavy duty interlocking tiles from black stones. The blocks are heavily
compressed to make them solid and durable. They are produced in different
colours and designs. The plant has a production capacity of 60 sq metres
a day.